01
Oil Filtration Plant
3,000 – 12,000 litres per hour
Removes particles, sludge and free water from transformer oil.
We own and maintain the plant and instruments needed to treat transformer oil and test equipment thoroughly, on site or in our Ajman workshop. Below is the equipment our engineers work with every day.




Plant & equipment
We run our own transformer oil filtration, high-vacuum dehydration and dry air plants, with storage tanks and vacuum pumps sized for transformers up to 250 MVA. Oil can be treated on site, so units return to service sooner.




01
3,000 – 12,000 litres per hour
Removes particles, sludge and free water from transformer oil.
02
1,200 L and 6,000 L
Degasses and dries oil under vacuum to restore its dielectric strength.
03
2,000 – 6,000 litres per minute
Pull the tank and windings under vacuum for drying and oil filling.
04
2,000 – 30,000 litres
Hold oil safely while a transformer is drained, repaired and refilled.
05
For drying during repair and filling
Supplies dry air so moisture stays out of open tanks and insulation.
06
Workshop oil handling
For cleaning, impregnating and handling components in oil.
Test instruments
A complete set of electrical and oil test instruments lets us diagnose faults, confirm repairs and commission transformers without waiting for third parties. Results are read together to find the real condition of each unit.




01
Oil breakdown voltage
Measures the voltage at which insulating oil breaks down.
02
Sweep frequency response analysis
Detects winding movement and core faults after transport or a fault.
03
Dissipation factor
Checks the quality and ageing of bushing and winding insulation.
04
Winding & tap changer checks
Finds loose connections, broken strands and tap changer contact problems.
05
Contact resistance
Measures very low resistances across joints, busbars and breaker contacts.
06
Withstand testing
Proves insulation can withstand its rated test voltage.
07
IR & polarisation index
Measures insulation resistance between windings and to earth.
08
Timing & travel
Records breaker opening and closing times and contact behaviour.
09
Protection relay testing
Injects test currents and voltages to verify protection relays.
10
Vector group & phasing
Confirms phase sequence and vector group before energising.
11
Waveform capture
Captures and analyses voltage and current waveforms.
12
Everyday measurements
Quick current, voltage and continuity checks on site.
On site
Equipment that lets our teams work safely and independently at substations and project sites, from temporary power to earthing.
Enquire now





01
Safe test supplies
Separate test equipment from the mains for safer measurements.
02
Independent power on site
Power treatment plants and instruments where no supply is available.
03
Earthing & safety
Used for earthing installations and temporary safety earths.
We value open communication and are here to help. Reach out to our team for transformer repairs, oil treatment, testing or any project enquiry, and an engineer will get back to you.